Numbers, not narratives.

These are concept cases written for this design sample. The clients are invented and anonymised, and every figure is sample content, not a real result.

Ports & shipping · 14 months
Sample case 1 of 8 · Container terminal · West Africa

Eighteen percent more boxes through the same eleven cranes.

The problemBerth productivity had stalled at 22 moves an hour while volumes grew 9% a year. The board was being pitched a $140M crane order.
What we didWe rebuilt the yard plan around vessel windows, moved reefer stacks closer to the quay, and re-rostered crews to the arrival curve instead of fixed shifts.
Berth moves per hour+7
Before22
After29
+18%throughput
22→29moves per hour
$140Mcrane order cancelled

All cases

SHOWING ABOVE
Ports & shipping Eighteen percent more boxes through the same eleven cranes. +18%throughput
CASE 02
Rail Three yards closed, eleven points more on time. $41Mopex out a year
CASE 03
Metals Pricing that moves with the energy bill. +3.4pts EBITDA
CASE 04
Energy Same budget, built in a smarter order. +1.8pts portfolio IRR
CASE 05
Ports & shipping Fewer sailings, fuller ships. −12%fuel burn
CASE 06
Metals Ninety-six days of inventory down to sixty-one. $118Mcash released
CASE 07
Packaging & food One buying desk instead of six. $19Msaved a year
CASE 08
Packaging & food Thirty-eight percent fewer SKUs, nobody noticed. −38%SKUs